60 + 300 m3/day Integrated Industrial Wastewater Treatment Plants In Hunan
Motiva manufactured, installed and commissioned two above-ground integrated wastewater treatment plants for an industrial wastewater project in Hunan, China. The two equipment sets provide stated capacities of 60 and 300 m3/day, for a combined 360 m3/day.
The project view shows the two equipment bodies, external pipework, pumps and maintenance access used in the installed layout.
What Was Installed For The Hunan Project
The project combines two integrated treatment plants of different capacities in one installed system. The source record confirms manufacturing, site installation and commissioning without publishing the internal process route or numerical water-quality results.
Project At A Glance
What The Dual-System Installation Shows
The real site photographs establish the equipment quantity, relative scale, above-ground installation form and visible site interfaces. For a comparable industrial project, Motiva confirms:
Engineering Value Of The 60 + 300 m3/day Configuration
The documented project confirms two different equipment capacities. In similar projects, this form can help engineers separate hydraulic duties, match distinct wastewater streams or create a staged operating arrangement after the actual flow balance is verified.
Separate Capacity Blocks
Two capacity blocks provide a practical basis for distributing flow or serving different operating duties. The final allocation should follow average and peak flow, wastewater characteristics and the operating schedule.
Above-Ground Access
External stairs, platforms and visible connections make routine inspection and equipment access easier to plan than a fully buried installation, subject to the final site layout.
Site-Specific Integration
The treatment bodies must connect with pumps, pipework, electrical supply, foundations and upstream or downstream facilities. These interfaces are confirmed during project design.
Installed Equipment Built Around Site Interfaces
The project photographs show that a complete integrated installation is more than the treatment body. Hydraulic connections, access arrangements and the transition from factory manufacture to site commissioning are part of the delivered project scope.
Two Integrated Treatment Bodies
Separate 60 and 300 m3/day above-ground equipment sets form the core of the documented installation.
External Pumps And Pipework
Visible pumps, valves and pipework connect the treatment equipment with the site's hydraulic system. Duties and materials are confirmed in the project design.
Maintenance Access
Stairs, platforms and top access support inspection and maintenance around the equipment bodies.
Manufacturing Through Commissioning
The source record covers manufacturing, installation, commissioning, operation and after-sales service for the Hunan project.
Pumps, Pipework And Access Built Into The Installed Layout
The close project view records the smaller integrated treatment body together with its external hydraulic connections and operating access.
Installed Equipment And External Interfaces
The site image provides practical evidence of how the integrated equipment connects with the surrounding installation.
Installed-System Functions And Engineering Interfaces
This table separates what the project photographs and source record confirm from the engineering functions that must be coordinated in a new industrial wastewater installation.
Project-specific process selection: the source document states that the treatment technologies were customized for the site's industrial wastewater, but it does not name the internal process stages. For a new project, the route is confirmed from representative influent data, flow variation, discharge or reuse targets, site conditions and required supply scope.
New-project interface review: submit the site layout, access limits, foundations, utilities and required manufacturing, installation and commissioning scope with the water data.
Two Integrated Systems Installed And Commissioned In Hunan
The documented scope covers manufacturing, installation, commissioning, operation and after-sales service for the 60 and 300 m3/day equipment sets.
Connect The Hunan Installation To Your Equipment Scope
Use the installed project as physical evidence, then review the industrial treatment route, equipment form and engineering interfaces that fit your own wastewater and site.
Industrial Wastewater Treatment
Review how wastewater source, pollutant profile, flow variation and outlet targets shape an industrial treatment route.
Explore Industrial TreatmentPackage Wastewater Treatment Plants
Compare factory-built equipment forms, capacity options, site connections and project-specific configuration inputs.
Compare Package PlantsWastewater Treatment Equipment
Review equipment families that can be combined around the selected industrial wastewater process route.
Review Treatment EquipmentProject Design And Site Interfaces
Turn water data, site conditions, outlet limits and supply scope into a project-specific process and equipment review.
Prepare Design InputsAnswers For Buyers Planning A Similar Industrial Project
These answers connect the documented Hunan installation with the decisions required for a new integrated industrial wastewater treatment project.
Request An Industrial Wastewater Project Review
Use the shared Motiva RFQ / Water Data Form to provide the wastewater source, flow, water-quality data, outlet target and site interfaces that determine the treatment route and equipment scope.