Guangdong 300 m3/day Containerized Wastewater System

Custom Equipment Delivery / 2025

300 m3/day Custom Non-ISO Containerized Wastewater System Delivered In Guangdong

Motiva delivered a custom non-ISO containerized wastewater treatment system for a remote construction project where limited land and rapid-deployment requirements shaped the equipment form. The corrugated steel module combined factory-prepared treatment zones and internal hydraulic features.

Compare Containerized Systems
Real Factory Dispatch View guangdong modular containerized wastewater treatment project loading
Custom equipment enclosure prepared for dispatch

The complete corrugated module is shown outside the factory on the delivery vehicle.

300 m3/day

Stated system capacity

Guangdong

Project location

2025

Delivery year

Non-ISO

Custom modular enclosure
Project Overview

What Was Delivered

The 2025 Guangdong delivery combined a custom corrugated enclosure, biological and physical/chemical treatment functions, an MBR equipment area and internal hydraulic features.

Project At A Glance

LocationGuangdong Province, China
Project stageEquipment manufactured and delivered
Stated capacity300 m3/day
ApplicationRemote construction project with limited land and rapid-deployment requirements
Equipment formCustom non-ISO containerized wastewater treatment system
ConstructionCorrugated steel panels
Treatment informationIntegrated biological and physical/chemical treatment functions
Equipment compartmentMBR membrane tank and equipment room
Internal featuresSludge hoppers, flow distributors and clarified-water weirs
StatusEquipment delivered in 2025
Comparable Project Inputs

Delivered Equipment And Project Conditions

The Guangdong delivery shows the custom equipment configuration and factory dispatch. For a comparable project, Motiva confirms:

Process route and final PFD
Module dimensions and quantity
Commissioning and performance criteria
Engineering Decision

Why A Custom Non-ISO Module Was Used

The enclosure was designed around the project footprint and internal equipment arrangement instead of being restricted to standard shipping-container dimensions.

01

Limited Site Footprint

Custom external dimensions give the equipment layout more freedom to follow the available land and required treatment zones.

02

Integrated Factory Preparation

The enclosure, treatment areas and internal hydraulic features can be coordinated before dispatch, reducing the amount of fabrication organized at a remote site.

03

Delivery-Oriented Equipment Form

A modular enclosure allows transport, lifting access, site interfaces and later installation requirements to be considered as part of equipment design.

Fabrication And Integration

Custom Equipment Built Around The Project

The delivered module brings together a site-specific enclosure, internal hydraulic structures, membrane-equipment zoning and factory preparation.

Enclosure

Custom Enclosure Fabrication

Dimensions beyond ISO standards and corrugated steel construction allowed the enclosure to follow project land and equipment-layout requirements.

Internal Flow

Internal Hydraulic Integration

Sludge hoppers collect settled solids, flow distributors help spread incoming flow, and clarified-water weirs support controlled water collection inside the system.

Equipment Zoning

Membrane Equipment Compartment

The workshop image shows an MBR membrane tank and equipment room arranged inside the custom module.

Factory Preparation

Integrated Delivery Preparation

The complete enclosure was positioned on a delivery vehicle after the major equipment housing and internal layout were prepared in the factory.

Factory Preparation

Membrane Compartment And Workshop Dispatch View

The workshop photograph shows the full-size corrugated module, the membrane-equipment area and factory dispatch activity.

1784783040703 4d2452459e1f08
Workshop Detail

Full-Size Custom Module Prepared In The Factory

The workshop view shows the scale of the corrugated enclosure and identifies the membrane tank and equipment-room zone on the module side.

Custom corrugated enclosure construction
Membrane tank and equipment-room identification
Complete module positioned on a transport trailer
Factory-stage lifting and dispatch activity
System Configuration

Treatment Functions In The Delivered System

The system combines biological and physical/chemical treatment functions with an MBR equipment area and integrated hydraulic features.

Treatment AreaDelivered-System DetailEngineering Role
Biological StageIntegrated biological treatmentBiological-stage selection depends on wastewater biodegradability, organic and nutrient loads, flow variation and the outlet target.
Physical/Chemical StagePhysical/chemical treatment functionsIndividual unit operations are selected from the actual contaminants, pretreatment need and downstream protection requirements.
Membrane EquipmentMBR membrane tank and equipment roomMembrane-equipment zoning coordinates access, aeration, pumps, piping, controls, cleaning and maintenance space.
Internal HydraulicsSludge hoppers, flow distributors and clarified-water weirsThese structures manage solids collection, flow distribution and clarified-water collection inside the system.
Outlet TargetClass A targetA new proposal confirms the applicable discharge standard, numeric limits and treatment route before equipment selection.

Motiva configures these treatment functions into a project-specific route using actual influent data, discharge targets, site conditions and required supply scope.

Delivery Status

Equipment Delivered In 2025

The custom containerized system was completed in the factory and dispatched for the Guangdong project.

From This Delivery To Your Project

Compare The Equipment Form And Treatment Options

Compare the enclosure form, modular arrangement and membrane system, then submit project data for a configuration review.

Delivery Configuration

Containerized Wastewater Treatment Systems

Compare enclosure formats, transport planning, site connections and the limits of standard container dimensions.

Compare Containerized Systems
Expandable Equipment Form

Modular Wastewater Treatment Systems

Review modular arrangements for staged capacity, site constraints and future expansion planning.

Review Modular Systems
Biological And Membrane Stage

MBR Wastewater Treatment Systems

Understand MBR selection inputs, membrane separation, equipment requirements and application boundaries.

Evaluate MBR Systems
Engineering Support

Project Design And Equipment Configuration

Prepare water data, site limits, target standards and supply scope for a project-specific treatment review.

Project Questions

Answers For Buyers Evaluating A Similar System

Capacity, module dimensions and equipment scope must be confirmed separately for every new project.

What was delivered for the Guangdong project?

Motiva delivered a system described as 300 m3/day in 2025 for a remote construction project in Guangdong. The equipment used a custom non-ISO corrugated enclosure and integrated biological and physical/chemical treatment functions.

Why was a custom non-ISO module used?

The enclosure dimensions were adapted to limited land and internal equipment-layout requirements instead of being restricted to standard shipping-container dimensions.

Which equipment features are included in the delivery?

The system includes corrugated steel construction, sludge hoppers, flow distributors and clarified-water weirs. The workshop image shows an MBR membrane tank and equipment room on the enclosure.

Can the same configuration be reused for another 300 m3/day project?

Capacity alone is not enough to select a process or module. A new design must account for the wastewater source, average and peak flow, pollutant loads, discharge target, footprint, access, utilities and required supply scope.

What should be submitted for a similar project review?

Send the wastewater source, average and peak flow, available water analysis, outlet standard, site dimensions, access and lifting limits, utility conditions, preferred equipment form and required installation or commissioning scope.

Similar Project RFQ

Request A Project-Specific Equipment Review

Send the wastewater source, average and peak flow, outlet target and site constraints through the Motiva RFQ / Water Data Form.

Wastewater source and average/peak flow
COD, BOD, SS, ammonia, TN, TP and other available indicators
Discharge, reuse or downstream treatment target
Site footprint, access, lifting and utility conditions
Required equipment, installation and commissioning scope

Motiva RFQ / Water Data Form

Water reports, drawings and site photos are useful, but the first review can start with basic flow, pollutant and site information.

Attach PDF, Excel or image reports when available. Actual configuration depends on wastewater characteristics and project requirements.

Great! We have received your message. Someone in charge will contact you shortly.

We are unable to process your submission. Please try again.

滚动至顶部

Request A Quote

Attach PDF, Excel or image reports when available. Actual configuration depends on wastewater characteristics and project requirements.

Great! We have received your message. Someone in charge will contact you shortly.

We are unable to process your submission. Please try again.