Installed Industrial Wastewater Project / Hunan

60 + 300 m3/day Integrated Industrial Wastewater Treatment Plants In Hunan

Motiva manufactured, installed and commissioned two above-ground integrated wastewater treatment plants for an industrial wastewater project in Hunan, China. The two equipment sets provide stated capacities of 60 and 300 m3/day, for a combined 360 m3/day.

Compare Packaged Plants
Installed Project View Hunan industrial wastewater treatment plant project visual
Two integrated treatment plants installed on site

The project view shows the two equipment bodies, external pipework, pumps and maintenance access used in the installed layout.

2 Equipment Sets

Integrated treatment plants

60 + 300 m3/day

Stated capacities

Hunan, China

Project location

Installed & Commissioned

Documented project stage
Project Overview

What Was Installed For The Hunan Project

The project combines two integrated treatment plants of different capacities in one installed system. The source record confirms manufacturing, site installation and commissioning without publishing the internal process route or numerical water-quality results.

Project At A Glance

LocationHunan Province, China
Wastewater sourceIndustrial wastewater from local industry
Installed capacity60 + 300 m3/day (360 m3/day total)
Equipment quantityTwo integrated wastewater treatment plants
Equipment formAbove-ground integrated wastewater treatment equipment
Treatment approachCustomized integrated route for the site's industrial wastewater
Project scopeManufacturing, installation, commissioning, operation and after-sales service
Project stageInstalled and commissioned
Project Scope

What The Dual-System Installation Shows

The real site photographs establish the equipment quantity, relative scale, above-ground installation form and visible site interfaces. For a comparable industrial project, Motiva confirms:

  • Wastewater analysis and the required treatment route
  • Capacity split, flow balance and operating philosophy
  • Foundations, site access, utilities and hydraulic interfaces
  • Commissioning scope and performance acceptance criteria
  • Engineering Context

    Engineering Value Of The 60 + 300 m3/day Configuration

    The documented project confirms two different equipment capacities. In similar projects, this form can help engineers separate hydraulic duties, match distinct wastewater streams or create a staged operating arrangement after the actual flow balance is verified.

    01

    Separate Capacity Blocks

    Two capacity blocks provide a practical basis for distributing flow or serving different operating duties. The final allocation should follow average and peak flow, wastewater characteristics and the operating schedule.

    02

    Above-Ground Access

    External stairs, platforms and visible connections make routine inspection and equipment access easier to plan than a fully buried installation, subject to the final site layout.

    03

    Site-Specific Integration

    The treatment bodies must connect with pumps, pipework, electrical supply, foundations and upstream or downstream facilities. These interfaces are confirmed during project design.

    System Integration

    Installed Equipment Built Around Site Interfaces

    The project photographs show that a complete integrated installation is more than the treatment body. Hydraulic connections, access arrangements and the transition from factory manufacture to site commissioning are part of the delivered project scope.

    Equipment Form

    Two Integrated Treatment Bodies

    Separate 60 and 300 m3/day above-ground equipment sets form the core of the documented installation.

    Hydraulic Interface

    External Pumps And Pipework

    Visible pumps, valves and pipework connect the treatment equipment with the site's hydraulic system. Duties and materials are confirmed in the project design.

    Operation

    Maintenance Access

    Stairs, platforms and top access support inspection and maintenance around the equipment bodies.

    Delivery Scope

    Manufacturing Through Commissioning

    The source record covers manufacturing, installation, commissioning, operation and after-sales service for the Hunan project.

    Installed Equipment Detail

    Pumps, Pipework And Access Built Into The Installed Layout

    The close project view records the smaller integrated treatment body together with its external hydraulic connections and operating access.

    hunan industrial wastewater treatment plant wide view
    Visible Project Details

    Installed Equipment And External Interfaces

    The site image provides practical evidence of how the integrated equipment connects with the surrounding installation.

  • Above-ground integrated treatment body
  • External pumps, valves and hydraulic pipework
  • Stair and platform access for inspection
  • Installed arrangement beside the larger treatment unit
  • Installed-System Functions

    Installed-System Functions And Engineering Interfaces

    This table separates what the project photographs and source record confirm from the engineering functions that must be coordinated in a new industrial wastewater installation.

    Project AreaInstalled ConfigurationEngineering Role
    Capacity Arrangement60 and 300 m3/day treatment unitsProvides separate capacity blocks that can be allocated according to the verified flow balance and operating plan.
    Treatment EquipmentTwo above-ground integrated treatment bodiesProvides a factory-built equipment form; the internal process is selected separately from influent data and outlet requirements.
    Hydraulic ConnectionsExternal pumps, valves and pipeworkConnects the equipment to site conveyance and other facilities. Pump duty, pipe material and control points are confirmed by the project P&ID.
    Operation And MaintenanceStairs, platforms and top accessSupports inspection, routine operation and planned maintenance around the installed equipment.
    Project DeliveryManufacturing, installation, commissioning, operation and after-salesAligns factory production, site work, startup support and post-installation service within one documented project scope.

    Project-specific process selection: the source document states that the treatment technologies were customized for the site's industrial wastewater, but it does not name the internal process stages. For a new project, the route is confirmed from representative influent data, flow variation, discharge or reuse targets, site conditions and required supply scope.

    New-project interface review: submit the site layout, access limits, foundations, utilities and required manufacturing, installation and commissioning scope with the water data.

    360
    Project Status

    Two Integrated Systems Installed And Commissioned In Hunan

    The documented scope covers manufacturing, installation, commissioning, operation and after-sales service for the 60 and 300 m3/day equipment sets.

    From This Project To Your Plant

    Connect The Hunan Installation To Your Equipment Scope

    Use the installed project as physical evidence, then review the industrial treatment route, equipment form and engineering interfaces that fit your own wastewater and site.

    Industry Solution

    Industrial Wastewater Treatment

    Review how wastewater source, pollutant profile, flow variation and outlet targets shape an industrial treatment route.

    Explore Industrial Treatment
    Integrated Equipment

    Package Wastewater Treatment Plants

    Compare factory-built equipment forms, capacity options, site connections and project-specific configuration inputs.

    Compare Package Plants
    Equipment Portfolio

    Wastewater Treatment Equipment

    Review equipment families that can be combined around the selected industrial wastewater process route.

    Review Treatment Equipment
    Engineering Support

    Project Design And Site Interfaces

    Turn water data, site conditions, outlet limits and supply scope into a project-specific process and equipment review.

    Prepare Design Inputs
    Project Questions

    Answers For Buyers Planning A Similar Industrial Project

    These answers connect the documented Hunan installation with the decisions required for a new integrated industrial wastewater treatment project.

    What is the treatment capacity of the Hunan project?

    The project uses two integrated treatment plants with stated capacities of 60 and 300 m3/day, providing a combined installed capacity of 360 m3/day.

    What type of equipment was installed?

    Two above-ground integrated industrial wastewater treatment plants were installed. The project photographs also show external pumps, valves, pipework, stairs and operating access.

    Were installation and commissioning included?

    Yes. The source record describes a scope covering manufacturing, installation, commissioning, operation and after-sales service.

    Which treatment process was used inside the equipment?

    The source states that treatment technologies were customized for the site's industrial wastewater but does not name the internal process stages. A new route should be selected from representative water analysis, flow variation and the required outlet target.

    Why might an industrial project use more than one treatment unit?

    Multiple units can support separate capacity blocks, different wastewater streams, staged operation or future operating flexibility. The appropriate arrangement depends on the verified hydraulic balance and operating plan.

    What data should be submitted for a similar project?

    Send the wastewater source, average and peak flow, representative water analysis, discharge or reuse target, site layout, access limits, available utilities and the required manufacturing, installation and commissioning scope.

    Industrial Project RFQ

    Request An Industrial Wastewater Project Review

    Use the shared Motiva RFQ / Water Data Form to provide the wastewater source, flow, water-quality data, outlet target and site interfaces that determine the treatment route and equipment scope.

  • Wastewater source and average/peak flow
  • Representative influent analysis and flow variation
  • Discharge, reuse or downstream treatment target
  • Site footprint, access, foundations and utilities
  • Required manufacturing, installation and commissioning scope
  • Motiva RFQ / Water Data Form

    Water-quality reports, site layouts, process notes and project photographs can be included with the inquiry.