Integrated Domestic Sewage Project / Guangdong

20 m³/day Integrated Domestic Sewage Treatment System In Guangdong

This Guangdong project uses an above-ground integrated system to treat domestic sewage generated at an industrial site. The 20 m³/day equipment combines activated-sludge aeration, biological conversion, solids separation, sludge return and PLC-based control in a compact equipment body.

Compare Package Treatment Plants
Real Guangdong Installation guangdong integrated sewage treatment equipment pipework
Integrated equipment installed above ground

The enclosed treatment body includes service doors, ventilation details and visible site pipe connections.

20 m³/day

Project treatment capacity

Guangdong

Project location

Activated Sludge

Main biological process

Above Ground

Visible installation form
Project Overview

What Was Installed For The Guangdong Site

The project brings the main activated-sludge treatment functions into one above-ground equipment body for a small, decentralized domestic sewage flow at an industrial site.

Project At A Glance

LocationGuangdong Province, China
Wastewater sourceDomestic sewage generated at an industrial site
Capacity20 m³/day
Equipment formAbove-ground integrated sewage treatment equipment
Main processActivated-sludge biological treatment
Named functionsAeration, biological degradation, gravity sedimentation and sludge return
Control approachPLC-based automated control
Outlet objectiveDB44/26-2001 Class I project target
Project stageEquipment installed on site
New Project Inputs

Design Inputs For A Similar Site

A new proposal uses the same engineering logic but is configured from the actual project conditions:

  • Average and peak flow together with influent water analysis
  • Current local discharge or reuse limits
  • Pretreatment, disinfection and sludge-handling requirements
  • Footprint, access, utilities and installation scope
  • Engineering Decision

    Why An Integrated Activated-Sludge System Was Used For This Project

    The 20 m³/day capacity, domestic sewage source and compact installed equipment form suit a decentralized biological-treatment duty rather than a large conventional plant layout.

    01

    Small Decentralized Flow

    At 20 m³/day, an integrated package system keeps the main treatment functions together for a site that does not require a large municipal-style plant.

    02

    Biodegradable Domestic Load

    Activated sludge uses suspended biomass to reduce biodegradable organic matter. Final sizing still depends on COD, BOD₅, TSS, ammonia, temperature and peak-flow data.

    03

    Accessible Above-Ground Layout

    The installed enclosure keeps doors, valves, pipe connections and equipment access visible above ground, which supports inspection and routine service planning.

    Treatment Integration

    Biological Treatment And Control In One Equipment Body

    Four connected functions define the activated-sludge system: oxygen supply, biological conversion, solids separation with sludge return, and automated control.

    Aeration

    Oxygen Supply For Active Biomass

    Aeration transfers oxygen into the biological zone so aerobic microorganisms can metabolize biodegradable organic matter.

    Biological Stage

    Activated-Sludge Conversion

    Suspended biomass adsorbs and degrades organic pollutants, converting part of the load into biomass, carbon dioxide and water.

    Solids Control

    Sedimentation And Sludge Return

    Gravity separation removes biological solids from the water. Returning part of the settled sludge helps maintain active biomass in the treatment system.

    Automation

    PLC-Based Equipment Control

    PLC-based control supports automated equipment sequencing and routine status management. Exact instruments, alarms and control points are defined for each proposal.

    Site Installation

    Installed Pipework And Service Access At The Guangdong Site

    At the installed unit, the integrated body meets the concrete foundation while external pipes, valves, vents and access doors remain accessible around the equipment.

    guangdong 20m3 integrated domestic sewage treatment system
    Installation Detail

    Equipment Interfaces Visible For Site Coordination

    The installed view gives buyers a practical reference for the interfaces that must be coordinated between equipment supply and site construction.

  • Equipment body positioned on a prepared concrete foundation
  • External pipework and isolation valves connected at site
  • Service doors retained for inspection and maintenance access
  • Ventilation and above-ground interfaces visible around the enclosure
  • System Configuration

    Treatment Functions In The 20 m³/day System

    These are the main functions named for the Guangdong equipment and the engineering role each function performs in an activated-sludge treatment system.

    Treatment AreaProject ConfigurationEngineering Role
    Biological AerationActivated-sludge aeration with oxygen supplySupports aerobic biomass activity and the reduction of biodegradable organic matter.
    Organic ConversionBiomass adsorption and biological degradationConverts biodegradable pollutants into additional biomass, carbon dioxide and water.
    Solids SeparationGravity sedimentation after biological treatmentSeparates biological solids from clarified water so biomass can be retained or removed.
    Sludge ReturnA portion of settled activated sludge returned to the biological stageMaintains an active biomass inventory. Return rate and excess-sludge handling are project design values.
    AutomationPLC-based equipment controlSupports sequencing and operating-status management; exact I/O, alarms and remote functions are defined separately.

    For a new site, Motiva confirms the complete route from actual water data and outlet limits. Pretreatment, disinfection, sludge handling, tank sizing and the final control scope are selected during project design.

    ✓
    Project Status

    20 m³/day Integrated System Installed In Guangdong

    The above-ground equipment is positioned on its foundation with site pipe connections and service access in place.

    From This Installation To Your Project

    Connect This Installation To Your Domestic Sewage Project

    Use the case as physical proof, then move to the relevant solution, package-plant selection and engineering pages for a new configuration.

    Solution Route

    Domestic Sewage Treatment

    Review pollutant concerns, process choices, outlet targets and design inputs for decentralized domestic sewage projects.

    Review The Domestic Sewage Solution
    Related Product

    Package Wastewater Treatment Plants

    Compare integrated equipment forms, capacities, biological routes, materials, installation options and project boundaries.

    Compare Package Plants
    Equipment Portfolio

    Wastewater Treatment Systems And Equipment

    Explore biological treatment, clarification, disinfection, pumps, aeration and other equipment selected around project data.

    Browse Treatment Equipment
    Engineering Support

    Project Design And Equipment Configuration

    Prepare water data, site limits, target standards and supply scope for a project-specific treatment review.

    Prepare Design Inputs
    Project Questions

    Answers For Buyers Evaluating A Similar System

    These answers separate the visible project facts from the water data and design decisions required for a new domestic sewage treatment system.

    What is the capacity and wastewater source for this project?

    The treatment capacity is 20 m³/day. The equipment was supplied for domestic sewage generated at an industrial site in Guangdong Province, China; it should not be interpreted as a treatment reference for the site's industrial process wastewater.

    Which biological process is used in the Guangdong system?

    The Guangdong system uses an activated-sludge process. Its main functions include aeration, biological adsorption and degradation, gravity sedimentation and return of part of the settled sludge.

    What does the integrated equipment combine?

    The case confirms the core biological-treatment and control functions in an enclosed equipment body. A new supply list must separately confirm pretreatment, disinfection, sludge handling, pumps, blowers, instruments and installation services.

    Is the system installed above ground or underground?

    The Guangdong project photographs show an above-ground installation on a concrete foundation. Integrated systems can be configured differently for another site after access, civil works, groundwater, ventilation and maintenance requirements are reviewed.

    Did the project meet the DB44/26-2001 Class I standard?

    The Guangdong system was specified around a DB44/26-2001 Class I outlet objective. Compliance should be evaluated against the applicable current limits and verified commissioning or operating data before discharge or reuse decisions are made.

    What data is needed for a similar 20 m³/day project?

    Send the wastewater source, average and peak flow, COD, BOD₅, TSS, ammonia and other available analysis, the current outlet target, site dimensions, utilities, access conditions and the required equipment, installation and commissioning scope.

    Domestic Sewage Project RFQ

    Request A Domestic Sewage Project Review

    Use the shared Motiva RFQ / Water Data Form to define the flow, water quality, outlet target, site conditions and supply boundary for an integrated sewage treatment proposal.

  • Wastewater source and average/peak flow
  • COD, BOD₅, TSS, ammonia and other available indicators
  • Current local discharge, reuse or downstream-treatment target
  • Site footprint, access, foundation and utility conditions
  • Required equipment, civil-interface, installation and commissioning scope
  • Motiva RFQ / Water Data Form

    Water-quality reports, site layouts and project photographs can be included with the inquiry.

    滚动至顶部