Urban Wastewater Project / Hohhot, Inner Mongolia

Integrated Sewage Treatment And DAF Equipment For Hohhot Urban Wastewater

Motiva supplied an integrated sewage treatment unit together with dissolved air flotation equipment for an urban wastewater management project in Hohhot. The project record identifies pretreatment, biological treatment and advanced purification functions, while factory photographs show the equipment prepared for dispatch.

Compare DAF Systems
Project Equipment / Factory Dispatch hohhot integrated sewage equipment dispatch
Integrated sewage treatment unit prepared for transport

The enclosed equipment body is shown on a flatbed at the Motiva factory before dispatch to the Hohhot project.

Hohhot

Inner Mongolia, China

Urban Sewage

Project application

Integrated + DAF

Supplied equipment packages

Installation

Reported underway in the source record
Project Overview

Two Equipment Packages For One Urban Wastewater Project

The case combines an enclosed integrated sewage treatment unit with a separate dissolved air flotation system. Together they address staged wastewater treatment and the separation of floatable or hard-to-settle material.

Project At A Glance

LocationHohhot, Inner Mongolia, China
Wastewater contextUrban domestic sewage management
Integrated equipmentEnclosed sewage treatment unit with pretreatment, biological treatment and advanced purification functions identified in the source
Companion equipmentDissolved air flotation system for separation of suspended solids, oils and other floatable impurities
Control approachAutomated operation stated for the integrated system
Project stageEquipment supplied; source record reports on-site installation underway
Project Record Scope

What This Case Confirms

The source confirms the project location, urban sewage application, integrated treatment unit, DAF equipment and reported installation stage. It does not provide capacity, water-quality values, a final process flow diagram or commissioning results.

Equipment photographs show the integrated unit and DAF package during factory dispatch preparation
The exact DAF position within the final flow sequence is not identified
The biological process family and internal zone arrangement are not named
Performance claims are therefore not presented as measured project results
New-project sizing remains dependent on actual flow, influent data and outlet requirements
Engineering Logic

Why Integrated Treatment And DAF Were Combined For This Project

The supplied equipment separates two engineering roles: an integrated unit concentrates the main treatment functions in a factory-built enclosure, while DAF adds a physical-chemical separation step for fine, light or floatable material.

01

Compact Process Integration

Prefabricating the main equipment package consolidates multiple treatment functions, mechanical interfaces and control requirements before site installation.

02

Targeted Solids Separation

DAF uses fine air bubbles to attach to light particles and floatable matter so they can be collected at the surface instead of relying only on gravity settling.

03

Project-Specific Coordination

The DAF location, coagulant strategy, biological load and downstream polishing must be coordinated as one system from the actual influent and discharge target.

Supplied Equipment

Integrated Sewage Treatment Unit And DAF System

The project record identifies two principal equipment packages. The internal process details remain project-specific, but each package has a clear treatment role and a visible factory-delivery form.

Main Package

Integrated Treatment Enclosure

The enclosed unit is identified as combining pretreatment, biological treatment and advanced purification functions within the supplied system.

Separation Package

Dissolved Air Flotation Equipment

The separate DAF unit is intended to remove suspended solids, oils and other floatable impurities through microbubble-assisted flotation.

Control And Interface

Automated Equipment Operation

Automated operation is stated for the system. The final control cabinet, instruments, alarms and remote-access scope should be confirmed for each new project.

Factory Evidence

Both Equipment Packages Prepared For Project Dispatch

The second factory view shows the enclosed integrated unit and the DAF equipment on the same transport vehicle, providing direct visual evidence of the combined project supply.

hohhot daf and integrated treatment equipment
Visible Project Supply

Integrated Unit, DAF Equipment And Associated Components

The photograph distinguishes the large enclosed treatment body from the DAF equipment, piping and electrical-control components staged for transport.

Enclosed integrated sewage treatment equipment secured on the transport vehicle
Dissolved air flotation unit visibly labelled on the second equipment package
Pipe sections, straps and a control enclosure staged with the shipment
Transport, unloading, foundation, piping and power interfaces still require coordinated site planning
Treatment Functions

How The Supplied Equipment Fits A Project-Specific Treatment Route

This is a functional equipment map, not a complete process flow diagram. The final sequence, tank volumes, chemical program and control points must be set from the Hohhot project design or recalculated for a new site.

Treatment AreaConfirmed Project Equipment Or FunctionEngineering Role And New-Project Inputs
Integrated PretreatmentPretreatment is named as a function inside the integrated treatment systemDefine screening, flow equalization and any upstream solids control from peak flow, debris, grit, oil and suspended-solids loading.
Biological TreatmentBiological treatment using microbial degradation is identified in the sourceSelect the biological process, aeration, recycle, sludge age and zone volumes from COD, BOD₅, ammonia, TN, TP, temperature and outlet limits.
Dissolved Air FlotationSeparate DAF equipment supplied with the integrated unitSize hydraulic loading, recycle pressure, air-to-solids ratio, coagulation and skimming from TSS, oil, colloids and treatability testing. Its final position in the route must be confirmed.
Advanced PurificationAdvanced purification is named as a system function; the individual stage is not specifiedConfirm clarification, filtration, disinfection or other polishing only after the discharge or reuse target is defined.
Automation And Site InterfaceAutomated operation is stated; control components are visible with the shipmentDefine PLC/HMI scope, instruments, alarms, remote access, foundation, piping, power, crane plan and installation responsibilities for the new project.

A similar system should be selected only after average and peak flow, influent water quality, required outlet limits, site layout, climate, utilities and operating responsibilities are confirmed.

Project Status

Equipment Supplied For Hohhot; Installation Reported Underway

The project source states that Motiva supplied the integrated treatment and DAF equipment and that on-site installation was underway. The available photographs document factory dispatch preparation; commissioning and measured operating results are not included.

Related Solutions And Products

Build A New Urban Sewage Route From Verified Project Inputs

Use this project as evidence of integrated-equipment and DAF supply. For a new plant, compare the relevant product families and submit water data before selecting the final route.

Solution Route

Domestic Sewage Treatment

Review sewage characteristics, biological treatment choices, outlet targets and project inputs for urban or decentralized applications.

Review The Domestic Sewage Solution
Separation Equipment

Dissolved Air Flotation Systems

Compare DAF equipment for suspended solids, floatable oils and light flocs, including the water data needed for sizing.

Compare DAF Systems
Integrated Equipment

Package Wastewater Treatment Plants

Evaluate factory-built treatment equipment, process configurations and site interfaces for compact wastewater plants.

Compare Package Plants
Engineering Support

Project Design And Equipment Configuration

Prepare flow, water quality, discharge limits, site conditions, logistics and supply boundaries for engineering review.

Prepare Design Inputs
Project Questions

Questions About The Hohhot Integrated Treatment And DAF Project

The answers separate confirmed project facts from the engineering decisions that still have to be made for a new urban sewage treatment system.

What equipment was supplied for the Hohhot project?

The project record identifies an integrated sewage treatment unit and a dissolved air flotation system as the main supplied equipment packages.

What role does the DAF system perform?

Dissolved air flotation uses microbubbles to lift suspended solids, oils and other floatable impurities to the surface for removal. Its sizing and chemical program depend on the actual wastewater.

Was DAF installed before or after biological treatment?

The available project record does not identify the final DAF position. For a new project, its location is selected from influent solids and oil loading, biological-process protection needs and the required outlet quality.

Which biological process is inside the integrated unit?

The source confirms biological treatment using microbial degradation but does not name the process family or internal zone arrangement. These details should be confirmed in the final process design.

Is the Hohhot system operating?

The source reports that equipment was supplied and on-site installation was underway. No commissioning report or measured operating data is included in the available record.

Can the same integrated treatment and DAF combination be used for another city?

The equipment combination can be evaluated, but it is not a universal template. Capacity, process sequence, DAF chemistry, biological loading and polishing stages must be recalculated from the new wastewater and outlet target.

What data is needed for a similar urban sewage project?

Send average and peak flow, COD, BOD₅, TSS, oil and grease, ammonia, TN, TP, pH, temperature, discharge or reuse target, site layout, utilities and required supply scope.

Urban Sewage Project RFQ

Request An Integrated Treatment And DAF Review

Send one set of project inputs through the shared Motiva RFQ / Water Data Form so the integrated equipment, DAF role, biological route, control scope and site interfaces can be reviewed together.

Service population or wastewater source, collection area and average/peak flow
COD, BOD₅, TSS, oil and grease, ammonia, TN, TP, pH and temperature
Current discharge limit, receiving point or intended reuse target
Available footprint, climate, road and crane access, foundation and utilities
Required equipment, DAF chemistry, controls, delivery, installation and commissioning scope

Motiva RFQ / Water Data Form

Water-quality reports, site layouts and project photographs can be included with the inquiry.

Attach PDF, Excel or image reports when available. Actual configuration depends on wastewater characteristics and project requirements.

Great! We have received your message. Someone in charge will contact you shortly.

We are unable to process your submission. Please try again.

滚动至顶部

Request A Quote

Attach PDF, Excel or image reports when available. Actual configuration depends on wastewater characteristics and project requirements.

Great! We have received your message. Someone in charge will contact you shortly.

We are unable to process your submission. Please try again.